Schedule Risk Analysis
Confidence-level finish dates for your MS Project schedule, with the risk register built in.
Why Schedule Risk Analysis?
A schedule shows one finish date, as if every task will take exactly as long as planned and no risk will ever happen. Neither is true. Schedule Risk Analysis (SRA) answers the question leadership actually asks: how likely are we to finish by that date, and what date can we commit to?
Most teams don’t run one, because it usually means a separate desktop tool, distributions typed into MS Project custom fields, and a risk register kept in a spreadsheet that never quite matches the schedule. Zakipu SRA puts all of it in one place, on the same schedule you already upload for performance tracking.
Build the Risk Register
List the events that could delay the program, how likely each is, how many days it would cost, and which tasks it would hit.
Set Duration Uncertainty
Say how uncertain task durations are, by WBS branch rather than task by task, and which tasks tend to move together.
Run the Simulation
The schedule is played out 1000s of times, with durations and risks drawn at random, following the schedule's real logic and calendar.
Read the Results
Get P50, P70, P80, and P90 finish dates for the milestones that matter, and see which tasks are driving the risk.
Features
Risk Register, Linked to the Schedule
- Each risk has an ID, description, likelihood of occurring, and an impact range in days.
- Every risk is linked to the real tasks it threatens, so its delay flows through the schedule logic instead of sitting in a separate spreadsheet.
- Turn a risk on or off with one click to see what happens if it’s mitigated, without deleting it.
- Retire risks that no longer apply and keep their history. Duplicate a risk to start a similar one quickly.
- Optional color tags for your own risk ratings.
- Each simulation keeps a snapshot of the risks it used, so later edits never change past results.
Duration Uncertainty by WBS, Not by Custom Field
- Set a rule once on a WBS branch, and every task beneath it inherits it. Override any task or sub-branch where it differs.
- Nine preset uncertainty levels, from Low to Extra High, plus a Deterministic option for tasks with fixed durations.
- Custom distributions for tasks with real estimates: triangular, PERT, normal, lognormal, or a constant value, entered through a guided editor.
- Correlation groups: give tasks that share a risk driver (one supplier, one immature technology) the same group, and they move together in the simulation, the way they do in reality.
- Profiles are saved per schedule and reused every month. When a new monthly update changes the schedule structure, you’re shown exactly what changed before anything is applied.
- Prefer the values already in your MS Project file? Run without a profile and the simulation reads them from the file’s custom fields.
Simulation You Can Trust
- Up to 50,000 iterations per run.
- Models all four relationship types (finish-to-start, start-to-start, finish-to-finish, start-to-finish), with lags and leads.
- Uses the schedule’s own working calendar and holidays, and honors MS Project date constraints.
- An optional schedule-wide correlation factor for effects that hit every task at once, such as a funding or staffing shock.
- A random seed option makes any run exactly repeatable, for fair before-and-after comparisons.
- Report on any milestones you choose, or on every task with no successor.
Results That Explain Themselves
- Confidence Level Analysis: P50, P70, P80, and P90 dates for each target milestone, next to the current planned finish, where that plan falls in the simulated range, and the gap between the plan and the P70 date.
- Finish Date Distribution: a histogram and S-curve for each milestone.
- Criticality Ranking: how often each task ended up on the critical path. This is often the most useful number on the page: it shows where risk reduction will pay off.
- Risk Register Summary: how often each risk actually fired in the run, and its average impact.
- Simulation Assumptions: exactly what each run used: how many tasks had uncertainty, which correlation groups and risks were modeled, and which profile was applied. A gap in the inputs is visible before anyone relies on a date.
- Clear diagnostics: tasks with no logic links, how each date constraint was handled, and any relationships changed to make a run possible.
History and Export
- Every run is saved. Record the runs you want to keep with a scenario name and a note, and find them again by scenario, milestone, or month.
- Export the full per-iteration data to CSV for your own analysis or reporting.
Guidance Built In
An Information section explains every setting, with suggested defaults and the common mistakes that skew results, such as double-counting a risk or leaving schedule margin tasks at full duration.
Who It's For
Schedulers and Risk Analyists
Get defensible confidence dates without using a second tool?
Project and Program Managers
Get ready for milestone reviews, rebaselines, or customer questions about the finish date.
PMO Analysts
Get one consistent risk method across every schedule.
Consultants
Get support delivering schedule risk assessments for clients at a single-seat price.
Standard Plan
-
Service/feature 1
-
Service/feature 2
-
Service/feature 3
-
Service/feature 4
-
Service/feature 5
Advanced Plan
-
Service/feature 1
-
Service/feature 2
-
Service/feature 3
-
Service/feature 4
-
Service/feature 5
-
Service/feature 6
-
Service/feature 7